RENEWABLE RAW MATERIALS

RENEWABLE RAW MATERIALS
FROM ELT WASTE

Powered by Enviro proprietary pyrolysis technology
Slide

INFINITERIA:
WHAT’S IN A NAME?
OUR COMMITMENT
TO THE FUTURE

Promoting circular economy recovering and transforming end-of- life tires

infiniteria
previous arrow
next arrow

WHAT'S IN A NAME?

OUR COMMITMENT TO THE FUTURE

A name is more than a label. For us, it’s a statement of purpose, to lead in the recovery and transformation of end-of-life tires into high value products for a circular economy. Our identity reflects our growth and our mission: to transform waste into resources by producing recovered Carbon Black (rCB) and Tire Pyrolysis Oil (TPO) of the highest quality.

WHO WE ARE

Infiniteria fractal

INFINITERIA EUROPE SÀRL

A joint venture formed between Antin’s NextGen Fund, Scandinavian Enviro Systems (“Enviro”) and Michelin to join forces for the development of tyre pyrolysis plants.

PLANT

Plant in Sweden

First Commercial Plant in construction in Uddevalla- Sweden - is expected to complete construction in H2 2025 with an initial capacity of c.35,000 tonnes p.a.

OUR TECHNOLOGY

tyres

Infiniteria has adopted the Enviro’s CFC process, which holds 3 patents in 52 countries.

NEWS

TIMELINE

MAR 2023

indicator

JV Set-Up

Infiniteria joint venture officially established

MAY 2023

indicator

Supply Agreement with Michelin

First Long-term supply agreement signed for recovered carbon black and TPO

FEB 2024

indicator

Uddevalla FID & Kick-Off

Final Investment Decision taken; construction launched; offtake contracts signed with Nokian Tyres & Preem

JUL 2024

indicator

First Roof Trusses Installed

Major construction milestone at Uddevalla site

FEB 2025

indicator

Trademark Certified

Infiniteria trademark WIPO certificate obtained

MAY 2025

indicator

RCB Production Fully Booked

New delivery agreements for recovered carbon black — Uddevalla 1 production 100% contracted

JUL 2025

indicator

Unified Brand Identity

Standardized legal entity names across countries to strengthen the Infiniteria brand

AUG 2025

indicator

First Reactor Delivered

First pyrolysis reactor arrives at the Uddevalla plant

SEP 2025

indicator

Reactor Delivery Completed

All five reactors delivered on site

Q1 2026*

indicator

Construction Completed

Uddevalla Plant reaches end of construction phase

Q1 2026*

indicator

First Feedstock Delivered

End-of-life tires received for initial processing

Q2 2026*

indicator

Commercial Operations Start

Infiniteria’s first plant in Uddevalla officially begins operations

*These are estimated future dates and are necessarily approximate. Infiniteria does not communicate these dates as final.